Setup
Production Optimization Assisted Setup
The Assisted Setup will guide you through the installation process of the Manufacturing Production Optimization App. Use the Search icon and select Set up Manufacturing Production Optimization.
Step 1: Define default values for Planning Optimization
You will be able to define the following default values:
-
Optimization Order Type – Choose which order statuses are retrieved (From Planned / From Firm Planned / From Released)
-
Default Optimization Period – Date formula used to compute the planning window on Factory Planning
-
Default Optimization Subperiod – Day, Week, Month, Quarter, or Year.
-
Default Planning Flexibility – Default value applied to retrieved lines (None or Unlimited)
-
Planning Flexibility after Optimization – Default value applied after applying the plan (None or Unlimited)
-
Maintenance Work Center – Work Center used by maintenance actions
-
Maintenance Item – Item used when creating a Maintenance Order
-
Allow Invalid Combinations – If enabled, the action Assign and Adjust ignore missing Changeover Matrix combinations (no blocking).
Step 2: Define Production Lines
Create one or more Production Lines with Default Starting/Ending Time, Preparation Time (and Unit of Measure), Default Optimization Subperiod, and Automatic Split.
Step 3: Create default values and demo set
On the Assisted Setup you will be able to create the following default values:
-
Optionally create a demo set for Planning Characteristics (up to 10) and respective Values.
-
Optionally Create Default Maintenance Routings – one certified routing per Production Line, constrained to the Maintenance Work Center.
Factory Planning Setup
Production Optimization has a specific page for Setup, to set standard information to be used on Factory Planning related actions:

In the Planning Optimization tab, fill in the following fields:
Field | Description |
---|---|
Optimization Order Type | Specifies from which status production order are to be utilized when creating Optimized Orders through Factory Planning. |
Default Optimization Period | Specifies the date formula used when retrieving the Orders on the Factory Planning. |
Default Optimization Subperiod | Specifies how the orders are divided into subperiod blocks. |
Planning Flexibility after Optimization | Specifies the default Planning Flexibility after adjusting the Optimization. |
Maintenance Work Center | Specifies the Work Center to be used when adding Maintenance Time. |
Maintenance Item | Specifies the Item to be used when adding Maintenance Order. |
Allow Invalid Combinations | Specifies if the Factory Planning should adjust invalid combinations (non-existence of Changeover Times) |
Permissions
To use this extension, all users need some extra permissions:
Permission Set | Name | Description |
---|---|---|
(BRIMPO_READER) | MPO - Reader | Users using this Permission Set can read all tables related to Production Optimization. |
(BRIMPO_BASIC) | MPO - Basic | Users using this Permission Set can see and reschedule Production Orders through Production Planning Overview and Optimize the Production process based on Changeover Matrix. |