Getting Started

App Installation and Prerequisites

System Requirements

  • Dynamics 365 Business Central (Essential or Premium edition).
  • Permissions to install apps from Microsoft AppSource.
  • Items using tracking (Lot, Package, or Serial No.) to benefit from Advanced Planning logic.

Optional Bricklead Extensions but recommended:

  • Inspection Status
  • Quality Requirements & Specifications (QRS)

Application Requirements

  • Only Advanced Planning logic applies to tracked items (lot/package/serial). Non-tracked items follow standard planning behavior.
  • Exclusions depend on configuration (expired/blocked tracking).
  • Planning allocation assumes FEFO (earliest expiry consumed first).
  • Integrations can extend exclusion rules to include Inspection Status and Quality Requirements & Specifications (sell-by / shelf-life).

Installation Steps

  • Navigate to Extension Management in Dynamics 365 Business Central
  • Search for “Advanced Planning by Bricklead” in AppSource
  • Select Install and accept the terms and conditions
  • Wait for installation completion (typically 2-3 minutes)
  • Refresh your browser to see new menu items

Firts Steps with Advanced Planning

Run Assisted Setup

  • Use the Search and look for Advanced Planning Assisted Setup.
  • Follow the guided steps to configure planning exclusion rules.
  • Default options include:
    • Excluding blocked tracking
    • Excluding expired tracking
  • The values defined here are saved to Advanced Planning Setup.

Review Advanced Planning Setup

  • Open Advanced Planning Setup from the Search menu.
  • Review and adjust the exclusion settings if needed:
    • Exclude Blocked Lots
    • Exclude Blocked Packages
    • Exclude Blocked Serial Nos
    • Exclude Expired Tracking
  • These settings control how eligibility rules are applied during planning.

Run Your First Planning Calculation

  • Open the Planning Worksheet.
  • Set filters for:
    • Item No
    • Location Code
    • Variant Code (if applicable)
  • Run Calculate Regenerative Plan as usual.
  • Advanced Planning applies eligibility rules automatically during the calculation.

Analyze Planning Results

  • From the Planning Worksheet, choose Log Planning Information.
  • Review:
    • Which lots were included or excluded
    • The reason for exclusion (expired, blocked, inspection status, sell‑by)
    • How supply and demand were balanced
  • Use this page to validate results before carrying out action messages.

Key Pages and Their Purpose

Page Purpose
Advanced Planning Setup Setup page where exclusion rules are maintained and adjusted after installation.
Log Planning Information Analysis page used to understand how planning evaluated demand and supply.
Calculation Profile (FactBox) FactBox displayed on the Planning Worksheet when automated planning is configured. Allows users to run, edit, or troubleshoot background planning runs.
Export / Import Demand Forecast Wizards Tools used to export forecast data to Excel and import updated quantities back into Business Central with validation.
Previous
Next